| The first week of the new training dig started in the sunshine, and the good weather made initial progress easy. Trenches 1, 2, 6, 7, and 8 had already been cleared of turf or tarmac and the first trainees got straight into removing deposits... | |
| Trench 1 Smaller than originally intended due to the presence of a modern gas tap, work in Trench 1 began by clearing a series of mixed rubble-filled dumps related to the demolition of the nineteenth-century Exhibition Centre. During excavation, six parallel low walls were unearthed, running across the trench width - these were identified as the supporting foundations of the wooden sprung floor of the Exhibition Centre. |
|
![]() |
|
| Trench 2 Unlike Trench 1, no features were apparent, and work began in Trench 2 with the excavation of a large levelling deposit that covered the whole trench. Though also within the footprint of the Exhibition Centre, the walls that appear in Trench 1 do not seem to extend into Trench 2, and further work will be needed to account for the differences between the two trenches. |
![]() |
|
Trench 6
Trench 7 Trench 8 |
|